Las Laderas del Pinillo

179 homes with 0 to 4 bedrooms, commercial units and garages in Torremolinos (Málaga), with views over the Alboran Sea and a communal Rooftop Club.

Rendering of the Las Laderas del Pinillo facade in Torremolinos
Torremolinos, Málaga · Costa del Sol

179 homes · 0-4 bedrooms · Luxury penthouses

179

Homes

11,204 m²

Land

26,462.42 m²

Buildable area

May 2028

Construction start

Construction start dates do not affect the debt investment repayment schedule.

Project summary

A large-scale development on the Costa del Sol.

The project brings together two adjoining plots — one municipal (7,079 m²) and one private (4,125 m²) — into a single 11,204 m² site. Total buildable area reaches 26,462.42 m².

  • Homes with 0 to 4 bedrooms and an average surface of 133 m²
  • Luxury penthouses with solarium, private jacuzzi and sea views
  • Ground-floor commercial units
  • Underground garages and storage rooms
  • Communal Rooftop Club and shared amenities

Use program

UseSurfacePriceRevenue
Free-market housing22,858 m²€4,200/m²€96.00 M
Subsidized housing (VPO)1,023 m²€2,350/m²€2.40 M
Commercial units2,582 m²€1,350/m²€3.49 M
Garages and storage rooms5,135 m²€2.96 M

Figures taken from the May 2026 feasibility study. Urban planning parameters will be confirmed with the municipal file.

Gallery

Finishes and spaces designed for living.

Living room with views of the Alboran Sea
Integrated design kitchen
Master suite with panoramic views
Luxury penthouse with solarium and jacuzzi

Financial structure

Project figures.

The financial model is based on a total investment of €70.78 M and estimated revenue of €104.85 M, with a pre-tax profit of €34.08 M.

Total investment

€70.78 M

total cost excl. VAT

Estimated revenue

€104.85 M

sales excl. VAT

Estimated profit

€34.08 M

before taxes

Margin on sales

32.5%

ATU scenario

Main costs

  • Land acquisition€5.53 M
  • Construction (building + development)€44.99 M
  • Marketing costs€6.29 M
  • Technical fees€4.69 M
  • Financial costs€3.71 M

Public interest of the ATU

The Urban Transformation Action (ATU) multiplies municipal buildable capacity compared to the 1996 general urban plan and delivers more infrastructure and development to the municipality.

×2.9

Municipal buildable capacity

+€72.4 M

Additional revenue

Timeline

Urban planning milestones and construction schedule.

The urban planning process takes 24 months. As of September 2026 we are in phase 4 (municipal approval of the PRI). Construction of the homes is expected to start in May 2028.

Urban planning phases

1

1 · Drafting and delimitation proposal

Nov 2025 – Jan 2026

Completed
2

2 · Municipal approval (delimitation)

Feb – May 2026

Completed
3

3 · Interior Reform Plan + consensus

Jun – Sep 2026

Completed
4

4 · Municipal approval (PRI)

Oct 2026 – Mar 2027

In progress
5

5 · Reparceling project

Apr – Jul 2027

Pending
6

6 · Development + construction start

Aug – Oct 2027

Pending
Urban planning timeline for Las Laderas del Pinillo